Why not just run fans and open the windows?
Fans move moisture into the air and something has to take it out again. On a humid day, open windows bring in air that is already carrying water, so the room gets warmer and no drier. A closed space with a dehumidifier removes water from the building instead of moving it around in it.
The exception is a dry, breezy day with low outdoor humidity, when ventilation genuinely helps. That is a judgment made with a reading rather than by how the weather feels, and it is rarely the right call during the kind of warm, wet spell that follows a storm in this part of Indiana.
There is also a growth risk in the fans-only approach. Moving large volumes of humid air around a house spreads moisture, and anything organic in the path of that air has a better chance of growing something. Containment plus dehumidification does the opposite: it concentrates the problem and then removes it.
What counts as dry?
A material is dry when its moisture content matches equivalent unaffected material in the same building, and holds there across visits. That is why a crew reads a dry wall as well as a wet one on the first day. There is no single national number that applies to every house.
Using the building's own dry readings as the target avoids two opposite mistakes. It stops a crew stopping early in a house that is naturally damp, and it stops it running equipment for days trying to dry wood below the level the rest of the house sits at. The comparison is the standard, which is why those first-day readings matter.
The other half of the definition is time. One reading at target can be a surface effect, especially on masonry, where the face dries ahead of the core. Two or three consistent visits at target are what justifies pulling the machines, and that is the pattern the log should show.
How long does drying usually take?
Most jobs run several days rather than one or two, with masonry and anything that had to be opened at the slow end. The variables are material, how long the water sat, how much was removed and how well the chamber can be closed.
Two similar-looking basements can finish a week apart for reasons that are entirely about material. Painted block with a bare slab dries in the open and relatively fast. The same room finished with furring, paneling, insulation and carpet holds water in four separate assemblies, each of which has to be opened or removed before the drying even begins to count.
The guide on how long drying takes goes into the readings in more detail. The practical point for a household living around the equipment is that the end date is a measurement rather than a promise, and that a crew which gives a confident day count before taking a single reading is guessing.
Does drying prevent mold, or just delay it?
Drying removes the condition growth needs, so it prevents it where it is done soon enough and thoroughly enough. It does not treat growth that already exists. If something is already growing, that gets handled first, with containment and removal, and drying follows.
The relevant factors are how long the material stayed damp and whether it is something organic. Framing lumber, paper-faced drywall, insulation and the backing on flooring all qualify. Concrete, block and steel do not, which is why a bare masonry basement is far more forgiving than a finished one even with the same amount of water.
Where growth is visible or suspected, the page on mold after water damage sets out how that work is run. Indiana does not appear to license water restoration at state level and has no state mold license, so ask any crew what standard it works to; IICRC certifications such as WTR and ASD are voluntary industry credentials.